Road and Bridge Conditions
Map (List View)
Category | SCHEDULED ROADWORK, Slope stabilisation, Planned |
Advice | Reduced speed limit Check signage Traffic control will be in place 24hrs a day. |
Speed Limit | 60 |
Schedule | Affected Northbound Every Day - (all day - ) |
Roads | Freemans Drive, Gap Road, Freemans Waterhole |
View more details
Location: (-32.968235, 151.480038)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Check signage Exercise caution Traffic controllers will be on site to direct motorists. Motorists are advised to allow approximately 5 minutes of additional travel time. Vehicles over 4.5m wide are to use the wide load bays provided and follow advice on signage. Lane width restrictions in place, with 3.5m lanes and 1m shoulders available throughout worksite. Drivers of Oversize and/or Overmass are required to contact the works supervisor 0458 215 602 |
Speed Limit | 40 |
Schedule | Affected Northbound Sunday - (8:00pm - 5:00am) Affected Northbound Monday - (8:00pm - 5:00am) Affected Northbound Tuesday - (8:00pm - 5:00am) Affected Northbound Wednesday - (8:00pm - 5:00am) Affected Northbound Thursday - (8:00pm - 5:00am) |
Roads | M1 Pacific Motorway, Freemans Drive, Freemans Waterhole |
View more details
Location: (-33.0159231, 151.4876103)
Location: (-32.88914, 151.6014)
Notes | Road: Full Road is closed between 19 -23 Beach Road Wangi Wangi due to landslip affecting road. Extended wet weather and declared natural disaster events in the period between March and July 2022 has damaged public infrastructure at a number of locations throughout Lake Macquarie. Beach Road at Wangi Wangi was damaged during a landslip in April 2022. The road has been closed at the landslip site and detours are in place to direct traffic along Lake View Road. Access is still available for local residents on Beach Road to access their properties. Council is in the process of gaining the appropriate planning approvals and procuring a contractor to complete the construction works. Construction is expected to begin mid-2025 and completed by January 2026. Residents will be advised prior to the commencement of works |
Closure Date | 13/04/2022 |
Estimated Fix Date | 01/01/1970 |
Location: (-33.0730650262294, 151.579138166996)
Notes | Road: Partial - delays expected Lane closed and speed reduction in place |
Closure Date | 12/07/2022 |
Estimated Fix Date | 01/01/1970 |
Location: (-32.9707117427339, 151.481792084633)
Notes | Road: Full Land slip creating potential of road failure |
Closure Date | 09/04/2024 |
Estimated Fix Date | 04/10/2024 |
Location: (-33.1652380596025, 151.630276745011)
Notes | Road: Partial - delays expected Road rehabilitation and new stormwater infrastructure. |
Closure Date | 30/05/2024 |
Estimated Fix Date | 30/06/2025 |
Location: (-33.0466819592038, 151.580485516032)
Notes | Road: Partial - delays expected Council is conducting works to strengthen the existing culvert and performing minor road reconstruction to Marmong Street at Marmong Point. Efforts are being made to ensure the work won’t affect bus routes or major traffic, and temporary light signals will manage the flow of vehicles. For further enquiries please contact Aaron Nillesen (Project Manager) on 4921 0333 |
Closure Date | 21/10/2024 |
Estimated Fix Date | 29/11/2024 |
Location: (-32.9789825562027, 151.617102949702)
Data Authority: Transport NSW